On the 29th, we cleaned and inspected a short tower (105 feet) in Madrid, Iowa. I have been working on increasing my speed while setting up and breaking down now that I have a solid grasp on my responsibilities. The total time of the job depends greatly on the tender's speed with setup and breakdown (we call it "mob" and "de-mob"). This tank was mobilized, cleaned, inspected, and de-mobilized in about three hours. We were back in the truck by noon.
No comments:
Post a Comment